DDA District Centre, Janakpuri

Motorised Rolling Shutters for DDA District Centre — Janakpuri Delhi Installation

Janakpuri, New Delhi 100 Motorised Shutters Ongoing Project
100
Shutters Planned
Phased
Installation
0.9mm
GI Steel Slat

Phased Site Access, Strict Architectural Guidelines, Large-Scale Coordination

The Challenge

The massive redevelopment project required 100 motorized shutters installed in phases across multiple retail and parking blocks. The installation had to coordinate with civil work and integrate with the building management system for emergency fire overrides.

Our Solution

We supplied 100 heavy-duty 0.9mm GI steel shutters with RAL 7016 grey powder-coating and fire alarm relay integration. External side-mount motors provide zone-specific master controls and secure manual overrides.

  • 100 motorised shutters total across 4 distinct retail/commercial blocks
  • 0.9mm heavy-gauge GI steel slats for superior structural integrity
  • High-durability RAL 7016 grey powder-coating matching the modern exterior facade
  • BMS-integrated external motors with auto-trigger fire safety relays
  • Heavy-duty 75mm side guides anchor-bolted through reinforced concrete
""Goyal's team has integrated seamlessly with our structural schedule. Their phased delivery model has kept the site clean, and their electrical coordination has saved us weeks of troubleshooting.""
Project Engineer, Prime Contractor, DDA District Centre

System Overview

Product Heavy-Duty Motorised Steel Shutter
Curtain Material 0.9mm Galvanised Steel
Finish Grey Powder Coat (RAL 7016)
Motor 600kg & 800kg Side-Mount Motors
Controls Central Master Panel & Remotes
Safety Integration BMS Fire Relay & Safety Edges
Guides & Brackets 75mm Steel Tracks with Nylon Liners
Status Under active installation (Phases 1 & 2 complete)

Phases 1 & 2 Successfully Commissioned

The project is moving strictly according to schedule, with 65 of the planned 100 shutters fabricated and delivered. 40 units in the primary commercial block have been fully mounted, wired, and integrated with the main BMS control board. Our onsite engineers are coordinating directly with the electrical subcontractor to wire up the remaining retail blocks as civil works finish.

  • 65% of contract volume fabricated; 40 units fully commissioned
  • Zero structural alignment issues or bulkhead fitment callbacks
  • Phased delivery has ensured zero interference with other onsite work trades
  • BMS safety relay sequence verified and signed off by inspectors