The massive redevelopment project required 100 motorized shutters installed in phases across multiple retail and parking blocks. The installation had to coordinate with civil work and integrate with the building management system for emergency fire overrides.
We supplied 100 heavy-duty 0.9mm GI steel shutters with RAL 7016 grey powder-coating and fire alarm relay integration. External side-mount motors provide zone-specific master controls and secure manual overrides.
""Goyal's team has integrated seamlessly with our structural schedule. Their phased delivery model has kept the site clean, and their electrical coordination has saved us weeks of troubleshooting.""Project Engineer, Prime Contractor, DDA District Centre
The project is moving strictly according to schedule, with 65 of the planned 100 shutters fabricated and delivered. 40 units in the primary commercial block have been fully mounted, wired, and integrated with the main BMS control board. Our onsite engineers are coordinating directly with the electrical subcontractor to wire up the remaining retail blocks as civil works finish.
Get a professional measurement and a firm written quote within 2 hours. No charge, no obligation, no obligation.